+90 530 493 30 01 info@znr.com.tr TürkçeEnglish Online Payment
Dealer login
Home  /  Solutions  /  Facade and Thermal Insulation  /  Facade thermal insulation (ETICS)
Facade and Thermal Insulation

Facade thermal insulation — external insulation

External insulation is not a single product but an eight-layer system, and its performance is whatever its weakest link is. The most common failure is not in the insulation board but in the adhesive holding the board or in the render above it falling short.

Which one is your job?
01 — System

Refurbishment of an existing building

8 layers, in application order.

LayerProductRoleConsumption and packaging
01 Surface preparation Eski boya raspası ve aderans testi
not a ZNR product
Flaking paint and render are removed completely. If adhesion is not reliable, a pull-off test is carried out. —
02 Primer ZNR P 200
201
Mandatory on absorbent brick and aerated concrete. Stops the adhesive losing its water. 0.100–0.175 kg/m² (Varies depending on surface conditions)
5 kg and 30 kg plastic jerry cans
03 Board adhesive ZNR POLIBOND
500
Applied in a ribbon-and-dab pattern; at least 40% of the board surface must be in contact with the adhesive. The white alternative is 504 ZNR CEOFIX BOND.
⚠ a site–TDS difference for consumption is awaiting a decision
4–5 kg/m²
25 kg kraft bag
04 Insulation board EPS, XPS veya taşyünü
not a ZNR product
The thickness comes from the thermal insulation design. Boards are laid in staggered courses and interlocked at the corners. Equal to the facade area
05 Mechanical fixing — anchors Isı yalıtım dübeli
not a ZNR product
Mandatory on an existing building. Since the adhesion of the surface is unknown, the load is carried by the anchors; 6-8 per m². 6-8 pcs/m²
06 Render and reinforcing mesh ZNR POLIPLAST
501
Applied in two coats; the mesh is embedded while the first coat is wet and lapped 10 cm at the corners. Mesh from the supplier. The white alternative is 505 ZNR CEOFIX PLAST.
⚠ a site–TDS difference for consumption is awaiting a decision
4-5 kg/m²
25 kg Kraft Bag
07 Primer ZNR P 200
201
Before the decorative render. Evens out absorbency and prevents color variation. 0.100–0.175 kg/m² (Varies depending on surface conditions)
5 kg and 30 kg plastic jerry cans
08 Decorative render ZNR POLIDECOR
502
Grain-textured decorative render. Approximately 3.0 kg/m² at 2 mm thickness.
⚠ a site–TDS difference for consumption is awaiting a decision
2.50–4 kg/m²
25 kg kraft bag

Consumption and packaging are read from the product record and are not written separately on this page — when the product is updated, this is updated too.

02 — Products

ZNR products used in this system

4 products. The other items in the system (insulation board, dowel, drainage board, mechanical work) are not ZNR products and are not in the catalogue.

03 — From the field

Frequently asked questions

Should the adhesive be spread over the whole board?

Full coverage on an even surface, ribbon and dab on an uneven one. Whichever is used, at least 40% of the board surface must be in contact; any less and wind suction pulls the board off.

Are anchors always needed?

On a new building it depends on the design and the wind load; in the refurbishment of an existing building it is in practice mandatory. Unless the adhesion of the old painted surface has been measured, the load must be carried by the anchors.

Where in the render does the reinforcing mesh go?

Not in the middle but close to the outer third, embedded while the first coat is wet. Left too close to the surface it shows; left too deep it does not hold the crack. A 10 cm lap at the joints is essential.

What is the difference between POLIBOND and CEOFIX BOND?

Their descriptions and consumption figures in the catalogue are identical; the only visible difference is color — POLIBOND is grey, CEOFIX BOND is white. Which to choose in which situation is not written on the product pages; this distinction should be clarified by the technical team.

Let’s discuss the detail on site

Details such as the parapet return, the drain mouth and the expansion joint decide the fate of the system. Our technical team looks at it in place.

Request technical support