What finishes a terrace is not the rain but the water staying there. On a terrace with a bad fall, water ponds, lifts the coating through freeze-thaw cycles and finds its way in through the smallest discontinuity. The problem usually does not start in the middle of the surface; it starts at the foot of the parapet, around the drain and at the expansion joint.
4 layers, in application order.
| Layer | Product | Role | Consumption and packaging | |
|---|---|---|---|---|
| 01 | Falls and surface repair |
ZNR REPAIR C5
303
|
Ponding areas, cracks and cove returns. The fall must be at least 2%. |
2.00 kg/m² for 1 mm thickness
25 kg kraft bag
|
| 02 | Primer |
ZNR WP 130 PX
109
|
Solvent-borne polyurethane primer. Seals the pores and establishes the adhesion of the membrane. Mandatory. |
0.150–0.250 kg/m²
(Varies depending on surface conditions)
20 kg Set
(A: 17.35 kg – B: 2.65 kg)
|
| 03 | Waterproofing membrane |
ZNR WP 180
111
|
Solvent-free polyurethane, 2 coats crosswise, 2 mm in total. Seamless and flexible. Mandatory.
⚠ a site–TDS difference for mixing ratio, consumption is awaiting a decision |
1.40 kg/m² for 1 mm thickness
20 kg Set
(A: 17 kg – B: 3 kg)
|
| 04 | UV-protective topcoat |
ZNR PUWA TOPCOAT
416
|
Water-based polyurethane, 2 coats. Protects the membrane from UV yellowing. Mandatory on exposed terraces.
⚠ a site–TDS difference for consumption is awaiting a decision |
0.100–0.160 kg per coat
(Varies depending on surface conditions)
10 kg Set
(A: 8.2 kg + B: 1.8 kg)
|
Consumption and packaging are read from the product record and are not written separately on this page — when the product is updated, this is updated too.
8 products. The other items in the system (insulation board, dowel, drainage board, mechanical work) are not ZNR products and are not in the catalogue.

Cement-Based Fully Flexible Waterproofing Material

Solvent-Based Polyurethane Primer / Waterproofing Material

Solvent-Free Polyurethane-Based Waterproofing Material

General-Purpose Acrylic Primer

Shrinkage-Free Cement-Based Structural Fine Repair Mortar

Water-Based Polyurethane Topcoat Paint

Flexible Tile Adhesive

Ceramic and Wall Tile Grout
It is not. Waterproofing stops the water but does not prevent ponding. Standing water lifts the coating through freeze-thaw cycles and finds the smallest discontinuity. The fall must be at least 2%; otherwise a screed to falls is laid first.
It should not be. At a sharp 90-degree corner where the wall meets the slab the membrane is stretched and tears in time. A concave cove is formed at the corner with repair mortar and the waterproofing is carried over it.
Not directly. Polyurethane is incompatible with bitumen, and the bitumen can soften and migrate. The old membrane is removed, or a separating layer and a suitable primer are used — this situation should be put to the technical team.
Faster but wrong. A single thick coat skins over on the surface, does not cure underneath and blisters. Two coats are applied crosswise; the second closes the pinholes of the first.
Details such as the parapet return, the drain mouth and the expansion joint decide the fate of the system. Our technical team looks at it in place.